The project was fully implemented in 7 months in Limassol in cooperation with the designer of the client. Redevelopment of the premises was made.
Photos are presented in "Before / After" format.
Insulation of the facade with stone wool with further application of decorative plaster. Dismantling and installation of internal partitions, plasterboard ceilings. Installation of plumbing equipment, heating and air conditioning systems. Installation of new wiring. Installation of tiles in bathrooms, wallpapering, parquetry.
Installation of a wooden staircase. Installation of fireplace with subsequent finishing gypsum plasterboard and applying the decorative plaster of Ottocento of Oikos company. Heat-water insulation of the roof. Replacement of street tiles with expansion of the area for the barbecue area. Installation of drainage pipes.
Thank you, we received your message and will contact you shortly.